04. Scheduled Jobs: Reports
  • 07 Nov 2023
  • 1 Minute to read
  • Dark
    Light

04. Scheduled Jobs: Reports

  • Dark
    Light

Article summary

04. Scheduled Jobs: Reports

Scheduled Jobs: Reports

Select the Scheduled Jobs- Reports configuration group from the drop down menu on the Configuration Wizard: Application Configuration screen.

The Scheduled Jobs - Reports Configuration Group page


Reports: Email Body Text- Specify the text to be used in the body of legacy and ad-hoc report emails. (Default= "Attached is your scheduled report from Contract Insight.")

Reports: Email Subject Line- Specify the text to append to the subject line of legacy and ad-hoc report emails. (Default= "Contract Insight Report Delivery")

Reports: Emailer Timer- Set how often legacy and ad-hoc reports are sent (in hours)- Specify “0” to disable. (Default= '120')

Reports: Run Scheduled Legacy Reports- Set this option to True to specify if report scheduler should also be run against legacy reports (Compatibility setting for installs prior to 6/1/2011).


Was this article helpful?